A new 350-bedroom hotel at East India Docks – in close proximity to the ExCel Centre and right next to the CS3 Supercycle Highway – is being constructed by John Sisk & Son behind a traditional site hoarding solution from Panthera Group.

The new Travelodge has been designed to achieve a BREEAM ‘excellent’ rating which is facilitated by specifying a hoarding solution from Panthera’s construction site hoarding and fencing division; a responsible supplier with full sourcing and certifying credentials, including FSC® and PEFC™ and Temporary Works compliance.

The installation team installed some 93m of 18mm in-ground hoarding in a white gloss finish. Two further elevations are now in progress including TVCB hoarding to the pit lane and on-ground hoarding to the remaining boundary and access gates.

As well as the site hoarding solution for this high-profile site, Panthera Group has supplied a SiteProtector™ Alert System – a video verified, wireless alarm system. Housed in suitably rugged casing, with an internal PR security camera,it captures a 10-second, full colour video clip when triggered. The unit is rapidly deployed and can be moved to new areas around the site if required. Images are sent to a monitoring station for action and verification. SiteProtector™ Alert is an ideal solution for temporary site protection.

For every project completed and as part of its own corporate social responsibility policy, Panthera Group participates in a scheme to plant new trees via partner ‘Trees for Cities’; the only UK charity working on an international scale to plant urban trees and create greener cities.

Get in touch

Join the growing list of clients that have entrusted Panthera to provide construction site set-up services including hoarding, office fit-out, temporary site services, CCTV, access control and scaffold alarms on over 5000 building projects.