Since 2015, Durkan have been successfully working with Panthera under a single supplier framework agreement, this alone is testament to their ability and commitment in supporting Durkan through its own growth plans. In this time Panthera have safely installed in the region of over 8000 metres of hoarding across our schemes. Their MD Neal James and his team have always acted professionally and regularly go over and above to support our site teams.
Durkan are committed to driving down the C02 impact of its projects, EnviroHoard™ helps us from the start of the project and now it is Net Zero Verified will only further support our sustainability targets. I look forward to working with them in the future and would recommend their services to other contractors.
Dean Martin
Construction Director, Durkan Ltd
Sisk have been using Panthera across its various Wembley Park regeneration schemes since 2011 and since 2018 a national framework has been in place, during this time they have safely and professionally designed and installed a range of hoarding systems to suit the projects exacting requirements. In line with our own company sustainability strategy, we have been using their sustainable EnviroHoard™ system and have been impressed by its flexibility and in particular its sustainable attributes including its climate positive benefits, Tree Planting and Carbon Offsetting. I have always found them to be an easy and collaborative subcontractor to work with and would have no hesitation in recommending their services.
Ger Hayes BSc(Hons),Dip, MCIOB, MIEI, MAPM, MCABE
Regional Director, John Sisk & Son Ltd
Panthera are a Tier 1 Subcontractor to Lovell, who deliver in terms of H&S, quality of workmanship and have a pro-active attitude on site. In terms of commercial approach, Panthera are non-contractual and their quotations and valuations are of a very good quality. A major benefit of Panthera is that they can undertake the Site Hoarding, Temporary Electrics & Plumbing and CCTV Security on our project, these are procured under a single contract. Operationally they deliver these packages using their in-house teams and coordinate all packages saving our site teams having to coordinate multiple trades.
Dean Evans
Supply Chain Manager, Lovell
EnviroHoard™ not only helps us to meet our ambitious environmental targets, it also has real practical benefits. The panels needed to sit on top of a retaining wall with a 4m drop on one side. As EnviroHoard™ is installed from the rear, it eliminated the need for a partial road closure and the hiring of aerial platforms (MEWPS) which saved traffic disruption and cost and a further benefit was that the works did not have to take place at night.
The hoarding has a clean, professional looking appearance and does not need any on-going decorating maintenance and can be easily dismantled and reinstalled across the project with no loss in its visual appearance or structural integrity.
Matthew Davis
Project Manager, Kier
Firstly, the hoarding system we chose needed to be able to last for the entire project; this is because we made a conscious decision early on that a key driver across the scheme was to look for environmentally friendly alternatives. The EnviroHoard™ solution enabled us to meet that requirement perfectly.
We had been testing the product on simulated sites, but the opportunity to install in a real situation was ideal and has reaffirmed the benefits of the system. When coupled with the benefits of using a closed loop recycled solution that eliminates the use of trees, we believe EnviroHoard™ is the way forward for site hoarding solutions.
Scott Willson
Construction Manager, Durkan Ltd