Case Study
O2 Arena Project Mint- Access control and HD CCTV system
Read more
This substantial contract included instructions to design and install over 600m of both in-ground and self-supported hoarding.
The project began with our team installing 1000m of temporary security fencing to the site perimeter to secure the works area before our main hoarding works could commence. Also within the brief was the installation of multiple vehicle gates, access doors for site personnel and a full decoration service to maintain McLaren’s high profile corporate image.
Contact Us